Printer Friendly Logo

City of Pitt Meadows
12007 Harris Road
Pitt Meadows, B.C., V3Y 2B5

Telephone: 604-465-5454
Fax: 604-465-2404
Email: info@pittmeadows.ca

SaturdayFebruary 4 style="behavior:url(http://www.pittmeadows.bc.ca/css/iepngfix.htc);" /> 6 ° C

Permit Applications

How do I obtain a building permit?

Requirements:

Apply in person or by representative with a completed permit application form to:

Building Inspector,
12007 Harris Road,
Pitt Meadows

A completed permit application form is required, as are copies of plans showing, where applicable:

  • Site plan
  • Elevations
  • Floor plan
  • Cross sections

In addition, we may require:

  • Home Owner Protection Office (http://www.hpo.bc.ca) registration form for new homes
  • Strata Council permission (when applicable)

    Drawings are also required - (Samples of drawings can be supplied upon request.)

    Three fully detailed sets of plans drawn to scale are required to be submitted at the time of application, plans must contain sufficient detail to allow any competent person to construct the building or addition.

    Three complete sets of drawings are to include:

    Site Plan
    scale 1/16" or 1/20" (1:200 metric)
    Legal description.
    Size of site and adjoining street names.
    Size and location, including required yard set back from all property lines of buildings, proposed buildings or additions including accessory buildings.

    Floor Plans
    scale in 1/4" = 1' (1:150 metric)
    All rooms and use of each room.
    Size of each room.
    Size of windows and doors.
    All plumbing fixtures.
    All outside dimensions.
    Structural details i.e.: joist size and spacing, size of beams and columns.
    Total area of building.

    Elevations
    scale 1/8" = 1' or 1:100 metric
    Full views of front, rear and both sides of the building including additions.
    Exterior finish details i.e.: materials used.
    Sundeck addition requires railing details i.e.: height and type of construction.

    Cross Section
    Scale of 1/4" = 1' (1:50 metric)
    Showing method of construction.
    Showing structural and other pertinent details.

    Building Permits will be issued following approval of plans, location, zoning, water and sewer connections, etc., and upon receipt of permit fees.

    Expiration/Termination

    Every permit is issued upon the condition that the permit shall expire and the rights of the owner under the permit shall terminate if:

    • The work authorized by the permit is not commenced with 6 months from the date of issuance of the permit, or
    • The work is discontinued for a period of 12 months.

    How long does it take to get a Building Permit?

    It is recommended that you apply for a building permit a minimum of two weeks before the start of the project. You will be telephoned immediately when your permit is ready.

    When is a Building Permit Considered Complete?

    A building permit is complete when all aspects of the plan submitted for the permit has been completed. In the case of a new building, an Occupancy Permit will be issued when all inspections are complete and satisfactory, and once all survey certificates and engineer's reports (if applicable) and your sub-trades list for business license compliance are submitted.

    For further information please contact:

    Building Department
    City of Pitt Meadows
    T: 604-465-2428
    F: 604-465-2404

    What will my building permit cost?

  • Fees payable for the issuance of permit for the erection, addition, alteration, repair, removal or demolition of any building or structure or part thereof shall be as follows:

    Minimum Building Permit Fee $50.00
    Commercial, Industrial & Institutional
    ($10.00 per $1000.)
    1.0% of construction value
    Residential, including garages, carports & patios 1.0% of construction value
    ($10.00 per $1000.)
    Farm Buildings .7% of construction value
    ($7.00 per $1000.)
    Single-wide mobile or modular home $100.00
    Double-wide mobile or modular home $200.00
    New Wood Burning Applicance $100.00
    Move a Building $100.00
    Change of Occupancy $100.00 plus 0.7% of construction value ($7.00 per $1000.)
    Multiple inspection or off-hour inspections $100.00

    All Plumbing and Fire Sprinkler work is included with the building permit fee.

    How do I get an Electrical or Gas Permit?

    You must contact the B.C. Safety Authority for permits and inspections. The City of Pitt Meadows does not issue gas or electrical permits.

  • top

    Related Topics

     

    Contact: Building Inspectors
    Phone: 604-465-2430
    or 604-465-2460

    To schedule a building inspection
    Phone: 604-465-2428

    City of Pitt Meadows
    12007 Harris Road
    Pitt Meadows, B.C., V3Y 2B5
    Telephone: 604-465-5454
    Fax: 604-465-2404
    Hours: 8:30 am - 4:30 pm
    Monday to Friday